TRI-CITIES REGIONAL AQUATIC CENTER

TRI-CITIES, WASHINGTON


Aquatics International Dream Designs

FEASIBILITY AND CONCEPTUAL DESIGN

ORB Architects was retained by the Tri-Cities Aquatic Task Force to assist in the preparation of a feasibility and conceptual design study for a new indoor Tri-Cities Aquatic Center. ORB and Vic Davies Architects (VDA) prepared the conceptual design for this project. This concept consisted of a 67,910-square-foot wet-side aquatic facility and a 20,050-square-foot dry-side area, for a total facility area of 88,010 square feet. The basic facility was estimated to cost $24,534,551 (including sales tax, contingency, furnishings and equipment, design, testing, and construction administration). The addition of specialized water play equipment such as a Master Blaster, Flow Rider (surf machine) and corkscrew slides could bring the total facility cost to $28,534,551. These estimates did not include the cost of land.
More Info →

 
.
.
.
 



© ORB Architects. All rights reserved.

950 Pacific Avenue, Suite 450 Tacoma, WA 98402   |   phone: 425.226.3522   |   fax: 425.226.9115   |   marketing@orbarchitects.com